Additional capacity at Überackern/Überackern 2
In the upcoming yearly auctions GAS CONNECT AUSTRIA GmbH will launch an incremental capacity pilot. Incremental capacity will be offered by GCA at the Austrian/German border for the entry/exit points Überackern SUDAL (corresponding bayernets point: Überackern 2) and Überackern ABG (corresponding bayernets point: Überackern) from the 1st October 2019 onwards.
Currently bayernets could realize additional, limited allocable capacity (BZK) in the following amount:
- Additional 2.621.000 kWh/h BZK at Überackern 2 Entry (9.589.000 kWh/h currently offered, 12.210.000 kWh/h possible)
- Additional 6.366.825 kWh/h BZK at Überackern 2 Exit (4.733.175 kWh/h currently offered, 11.100.000 kWh/h possible)
These additional capacities could be offered by bayernets to match with increased capacities on the Austrian side.
Furthermore, bayernets could be able to increase the limited allocable capacity (BZK) offered in Überackern and Überackern 2 after completion of the new gas transmission pipeline MONACO 1 (estimated: 4th quarter 2017).