With our gas transmission system,
we take responsibility for your future:
bayernets – reliable, sustainable & innovative

We are sustainably securing the future of Germany’s economy with our gas infrastructure, ensuring a gas supply our customers can count on – always.

With our gas transmission system,
we take responsibility for your future:
bayernets – reliable, sustainable & innovative

We are sustainably securing the future of Germany’s economy with our gas infrastructure, ensuring a gas supply our customers can count on – always.

Our network structure data

You wish to know how long our pipeline network is, how many kWh we offtake every year, or what simultaneous annual peak load we handle? Here you will find updated and relevant information about our pipeline network in accordance with Section 23c Paragraph 4 S. 1 No. 1-5 of the Energy Industry Act (in German: Energiewirtschaftsgesetz (EnWG)) (as per: 31.12.2023).

Total length of high pressure pipeline:

1664.6 km

 

Lengths of high pressure plane according to pipeline diameters:

Class

A

B

C

D

E

F

G

Nominal diameter DN in mm

≥ 1,000700 ≤ x < 1000500 ≤ x < 700350 ≤ x < 500

200 ≤ x < 350

100 ≤ x < 200

x < 100

Length in km

87.4360.2486.2366.4328.026.89.6

 

Number of exit points in the high pressure network:

189

 

Annual energy taken for network distributors and end consumers:

60,274,940,033 kWh

 

Annual energy taken in total:

103,787,088,746 kWh

 

Simultaneous annual peak load of all energy taken:

1,906,487 m³/h (08.02.2023 05:00 hrs)