- All flows at Haiming 2-RAGES/bn and Haiming 2-7F/bn will be interrupted.
- This measure will not affect firm freely-allocable (FZK) entry and firm limited-allocable (BZK) entry and exit capacities at USP Haidach and Überackern 2.
- Interruptible exit capacity at USP Haidach and Überackern/Überackern 2 will remain unaffected by this measure as long as the total amount of booked and nominated interruptible exit capacity at USP Haidach and Überackern/Überackern 2 does not exceed 4.006.800 kWh/h.
(For Entry nominations using freely-allocable capacities (firm or interruptible) at Überackern, Überackern 2 and USP Haidach in sum a maximum flow of 4.006.800 kWh/h (depending on the pressure delivered by the storage operator at USP Haidach) will be possible)