This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.
New time frame:
1. Period 10.10.2018, 7 a.m. – 11 p.m.
2. Period 11.10.2018, 7 a.m. – 11 p.m.
3. Period 22.10.2018, 7 a.m. - 01.11.2018, 12 p.m.